Saturday 10 July 2010

ELECTRICITY GAME BY OUR LEADERS IN PAKISTAN

Taken from Source

Dear Pakistani's Read & Think!!!!!
Dear Pakistanis!
Read, Think & understand the game International Powers are playing with us with the help of!

Electricity produced in Pakistan is from three main sources.
1). Hydral
2). Thermal (Gas/Steam/Furnace Oil)
3). Nuclear
There are four major power producers in country which include Water & Power Development Authority (WAPDA), Karachi Electric Supply Company (KESC), Independent Power Producers (IPPs) and Pakistan Atomic Energy Commission (PAEC).
Below is the break-up of the installed capacity of each of these power producers (as of June-2008).
1. WAPDA
a. WAPDA Hydal

Terbela                                                            3478  MW  
   Mangla                                                             1000  MW  
   Ghazi-Brotha                                                     1450  MW    
   Warsak                                                              243  MW  
   Chashma                                                            184  MW  
   Dargai                                                                  20  MW  
   Rasul                                                                    22  MW  
   Shadi-Waal                                                           18  MW  
   NandiPur                                                               14  MW  
   Kurram Garhi                                                           4  MW  
   Renala                                                                    1  MW  
   Chitral                                                                     1  MW  
Jagran (AK)                                                            30  MW
Total Hydal                                        ==>       6461 MW

b. WAPDA Thermal
   Gas Turbine Power Station, Shadra                             59  MW

   Steam Power Station, Faisalabad                              132  MW  
   Gas Turbine Power Station, Faisalabad                      244  MW  
   Gas Power Station, Multan                                        195  MW  
   Thermal Power Station, Muzaffargarh                      1350  MW  
   Thermal Power Station, Guddu          1655  MW  
   Gas Turbine Power Station, Kotri                               174  MW  
   Thermal Power Station, Jamshoro                             850  MW  
   Thermal Power Station, Larkana                                150  MW  
   Thermal Power Station, Quetta                                   35  MW    
   Gas Turbine Power Station, Panjgur                            39  MW  
Thermal Power Station, Pasni                                     17  MW
Total Thermal                                     ==>        4811  MW

W
APDA's Total Hydal + Thermal capacity is  ==>      11272 MW.

2. Karachi Electric Supply Company

   Thermal Power Station, Korengi                               316  MW  
   Gas Turbine Power Station, Korengi                            80  MW  
   Gas Turbine Power Station, SITE                              100  MW  
Thermal Power Station, Bin Qasim                          1260  MW
Total (KESC)                                        ==>      1756  MW

3. Independent Power Producers (IPPs)

Hub Power Project                                                     1292 MW  
AES Lalpir Ltd, Mahmood Kot MuzaffarGarh                    362 MW  
AES Pak Gen, Mahmood Kot MuzaffarGarh                      365 MW  
Altern Energy Ltd, Attock                                                 29 MW  
Fauji KabirWala Power Company, Khanewal                    157 MW  
Gul Ahmad Energy Ltd, Korengi                                      136 MW  
Habibullah Coastal Power Ltd                                         140 MW  
Japan Power Generation, Lahore                                    120 MW  
Koh-e-Noor Energy Ltd, Lahore                                       131 MW  
Liberty Power Limited, Ghotki                                         232 MW  
Rousch Power, Khaniwal                                                412 MW    
Saba Power Company, Sheikhpura                                 114 MW

Southern Electric Power Company Ltd, Raiwind                135 MW  
Tapal Energy Limited, Karachi                                        126 MW  
Uch Power Ltd, Dera Murad Jamali, Nasirabad                 586 MW  
Attock Gen Ltd, Morgah Rawalpindi                                 165 MW  
Atlas Power, Sheikhpura                                                225 MW

Engro Energy Ltd, Karachi                                            ----- MW  
Kot Addu Power Company Limited (Privitized)                1638 MW

Total  (IPPs)                                              ===>   6365 MW
4. Pakistan Atomic Energy Commission

KANUPP                                                                     137  MW  
CHASNUPP-1                                                              325  MW

Total (Nuclear)                                          ===>   462  MW


Hydal Electricity generated by WAPDA varies between two extremities i.e. between minimum of 2414 MW and maximum of 6761 MW depending upon the river flow through the whole year.
Total Power Generation Capacity of Pakistan (including all sources) is 19855 MW and the electricity demand (as of today 20-04-2010) is 14500 MW and PEPCO is merely generating 10000 MW.
So it is obvious that these 15-20 hrs power shutdowns in most parts of the country are not because of the lack of generation capacity but only because of IMF / World Bank policies imposed on our nation by Govt. The Power Generation companies are not buying Furnace Oil from PSO by saying they don’t have money to do that but we are all paying for Electricity that is generated from Furnace Oil. This is the reason that top refineries like PRL are operating at 40% capacities. IMF / World bank has imposed to reduce budget deficit by importing less crude oil. But due to this fact all our industries are under severe crisis. None of our political party who are in Assembly is ready to speak on it because every one is blessed by US / IMF / World Bank.

Dear Pakistani’s,

This is a time to show your social activism your power and strength. It is your silence which is deafening and your couldn’t care less attitude which makes the people in power more powerful evasive and secure in their Air conditioned offices.

PLEASE STAND UP AND BE COUNTED: 
Please don't stop this e-mail and forward it to as many people as possible.
Thanks

WE WANT ELECTRICITY IN PAKISTAN
.

Electricity now is @11 Rs. per unit, and it will increase after every two months as directed by (American) IMF policies
.


Also CHINA offers to Pakistan Electricity for just Rs.200 Monthly Bill and Unlimited Usage of Electricity but our government is not taking the offer seriously. This is because there will be neither kick backs nor any commissions to be pocketed by the strong mafia of politicians and bureaucrats.

These people are there because of your votes. Let them serve you rather than rule you……

NOW THIS IS OUR TIME TO SHOW THE GOVERNMENT YOUR STRENGTH.

PLEASE SPREAD THIS MESSAGE AS MUCH AS YOU CAN, BECAUSE OF THIS MESSAGE MANY PEOPLE WOULD COME TO KNOW ABOUT THE TRUTH

1 comment:

  1. I really appreciate you for all the valuable information that you are providing us through your blog.

    Home Appliances Manufacturer

    ReplyDelete